Build the Azure landing zone, move agreed workloads in planned waves and hand over the resulting cloud environment to its operators.

Delivery pathwayINSYTO / PROFESSIONAL
  1. 01Source workloads
  2. 02Landing zone
  3. 03Migration waves
  4. 04Validate
  5. 05Azure operations
Validated handoff

Build the agreed target state, verify it and transfer operating responsibility.

Project triggers

When This Project Is Needed

Conditions to resolve before configuration, migration or rollout.

01

Workload dependencies and risk poorly understood

02

Landing zones not ready for production scale

03

A direct move may carry unresolved application constraints into Azure

04

Security baseline missing on Day 1

05

Cost overruns surface post-migration

Delivery scope

What Insyto Implements

Insyto validates workload dependencies and the approved migration plan, configures the Azure landing zone, runs migration waves and checks workload behavior after cutover. Security, cost controls and operating responsibilities are documented for the receiving team.

Defined project outputs
  1. Discovery & dependency mapping
  2. Azure landing-zone configuration against the agreed target design
  3. Migration waves & runbooks
  4. Cutover, continuity and rollback decisions for each migration wave
  5. Security baseline & guardrails
Project outputs

What the Project Delivers

Workstreams are confirmed in the statement of work for your environment.

Discovery & dependency mapping
Azure landing-zone configuration against the agreed target design
Migration waves & runbooks
Cutover, continuity and rollback decisions for each migration wave
Security baseline & guardrails
Cost-control settings and operating handoff
Acceptance

What Gets Validated and Handed Over

Specific acceptance criteria are agreed for each project.

Configured Azure landing zone
Migrated and validated in-scope workloads
Documented cost and security controls
Operational runbooks and ownership handoff
Delivery sequence

From Scope to Handoff

Discovery and acceptance criteria are confirmed for each project before production changes begin.

01

Discover

Confirm the approved workload list, dependencies, data flows, availability needs and owners before moving production systems.

02

Design

Finalize landing-zone, identity, network, policy and security configuration with migration waves and continuity decisions.

03

Implement or migrate

Build the agreed Azure foundation and migrate workloads in planned waves with documented cutover steps.

04

Validate

Test workload behavior, access, connectivity and monitoring after migration; follow the agreed fallback plan if acceptance fails.

05

Hand off

Transfer architecture records, migration outcomes, cost and policy settings, open issues and runbooks to the platform operator.

Fit

Who This Is For

Organizations migrating data center workloads, exiting legacy cloud, or rebuilding inconsistent Azure footprints into a CAF-aligned platform.

Technology

Platforms in Scope

  • Microsoft Azure
  • Azure Policy
  • Microsoft Entra ID
Scope boundary

What Is Separately Scoped

Application refactoring, data remediation and ongoing Azure administration require separate scope. Azure Cloud Strategy is the advisory step when workload disposition or target architecture is still undecided.